This type makes use of traditional paper blueprints and plans. For this to work, the estimator needs to be able to accurately read the materials for the type of work quantified, whether it’s general architectural drawings, an electrical schematic, a plumbing schematic, or something else. In addition to the diagrammatic representation of the project, the documents will contain symbols and notes that may indicate the type of required materials.
Key Types of Measurement Required in Take-offs for Most Projects- Count
- Length
- Area
- Volume
- Architecture Drawings
- mechanical Drawings
- Electrical, and
- Plumbing engineering (MEP) estimator
- Quantity of Material
- Types of Material
- Weight of Material
With our well-defined steps, we help customers to build milestones.

Who we serve
Quantity surveying and material take-off are key activities we are doing for our multinational clients, it includes:
- Residential Projects
- Commercial projects
- Government Projects
- Structural Projects